| Standing dead Lodgepole Pine logs delivered from Montana via semi-trailers. |
| We hired someone to excavate the footings and basement. |
| The cement pumper came at the crack of dawn when we poured the basement walls ourselves. |
| The interior footings, plumbing, and sand installed and packed before laying the vapor barrier, insulation, and radiant heating tubes. |
| We stayed up all night to get all the heat tubes installed before the cement crew came to lay the basement floor. |
| The logs are staged, prepared and cut to length for the perfect placement. This is no "paint by number" house, all log pieces are individually cut to fit from lineal feet of logs. Most logs came in 12, 16, and 20 feet lengths. |
| The basement wall and support system is built stout and strong... the floor systems have been installed and decking has been laid. |
| And the work of laying the logs continues on as our work schedule permits. When we are complete with our project, we hope to install logs as a business along with our son. |
| THERE WILL BE A ROOF ....SOON!!!!!!!!! :) Great works of art take TIME! :) |